TESS FENWICK

Progress Onsite Ramps Up by TESS FENWICK

The cedar soffit is starting to be fixed while the exterior cladding continues.  The Level 2 and 3 windows are currently being installed.  Check out the view from the shower!

Covering In. by TESS FENWICK

The Level 1 and 2 cantilevered roofs are currently being lined and covered. 

The Level 1-2 stairs have been poured and Kepka's are now working on the Level 2-3 stairs.

The windows should be making an appearance any day now.

Cantilevers Complete! by TESS FENWICK

Check out the cantilevers! - Thanks to Strata Group.  The extent of the building is now complete.  The skylights have been installed which allow light into the centre of the house.  Keep an eye out for the next major item -  the windows.

Level 3 Deck Pour Completed by TESS FENWICK

The Level 3 deck was the last major concrete pour other than site works.  The stairs are currently being formed in the voluminous stairwell and fixing of the cedar cladding has begun.